Case Study Library

Browse 70 approved industrial solutions from Welding Alloys

Quick Search

Start typing to search and filter cases in real-time

Showing 37-48 of 70 cases

Support tray Material A517Gr70

APPLICATION

Petrochem./RefineriesSriracha

Component: Support tray Material A517Gr70

Product:

The original surface was corroded by the oil refining process. We are looking for ways to protect the original surface and avoid welding, as the heat can damage it.

View Full Case Study

Cane Fibrizer Hammers.

STAR

SugarChennai

Component: Cane Fibrizer Hammers.

Product:

Their previous supply to customer is getting worn out in 3 months of operation, they want full campaign solution for the season.

View Full Case Study

Power plant membrane wall

APPLICATION

Power & Energyulsan

Component: Power plant membrane wall

Product: WA MCS 90S-B91

Customer was looking for reliable, quick delivery and cost effective welding consumables

View Full Case Study

FPSO piping

STAR

Distributorsulsan

Component: FPSO piping

Product: WA TSS 2594

1. Short lead time of 2 weeks delivery of 12 tons of Super Duplex stainless Soild TIG rods. 2. CVN requirement of Avg. 80J @ -50 deg C 3. Corrosion test ASTM G48 Method A with Zero pitting and maximum weight loss of 4gm/m2 at 40 degC after 24 hrs.

View Full Case Study

Forging Molds

APPLICATION

Automotive IndustryTianjin

Component: Forging Molds

Product: ROBODUR K L MoNi

The problem was high wear rate on the molds which the local repair consumables were not very effective

View Full Case Study

discharge chute

APPLICATION

Pulp & PaperMie Prefecture

Component: discharge chute

Product: Hardplate 100

The customer was experiencing a problem in which holes developed in the existing chute due to wear. The current solution involved shutting down operations, removing the highly combustible conveyed material, and then carrying out repairs by welding. However, this approach presented several challenges, including securing sufficient maintenance time and the associated repair costs.

View Full Case Study

Clutch body & lock

STAR

RailWarszawa

Component: Clutch body & lock

Product:

Korpus współpracuje z ryglem (tarcie typu metal-metal, pod naciskiem ok. 4-5kN). Oba elementy są wykonane z brązu. Klient poszukiwał rozwiązania, które gwarantowałoby żywotność tych elementów ok. 20 lat (ok. 1 mln cyklów pracy). Aby otrzymać wymaganą żywotność należało utwardzić powierzchnie współpracujące. Współpraca dwóch powierzchni wykonanych z brązu nie gwarantowała wymaganej żywotności (150 tyś cykli), a inne rozwiązania (przykręcane nakładki z blachy typu Hardox czy natrysk) nie przyniosły oczekiwanych rezultatów.

View Full Case Study

Sinter Bar

STAR

SteelFukuyama city, Hhiroshima prefecture

Component: Sinter Bar

Product:

Equipment that previously had a service life of one and a half years saw its lifespan reduced to less than a year following an increase in productivity; holes began to appear in the water-cooling system, and the sintered material was no longer being sufficiently crushed.

View Full Case Study

Boiler cladding for coal file power plant

APPLICATION

Power & EnergyThanh Hoa

Component: Boiler cladding for coal file power plant

Product:

We have no experience with this issue. When researching other companies, people usually offer boiler cladding with Inconel to prevent corrosion rather than erosion, as in this case.

View Full Case Study

Caster rollers ø230 idler

TECH

SteelTornio

Component: Caster rollers ø230 idler

Product:

Try Chromecore 4142N-S instead of Chromecore 4142MM-S with the objective to increase operational lifetime of the ø230 idler caster rollers.

View Full Case Study

ImPact Crusher

TECH

Cement & MineralsVirudhanagar

Component: ImPact Crusher

Product:

Earlier they are getting worn out within 1MT of crushing, now we extended to3 MT of material crushing, Got repeated order also.

View Full Case Study

Piping

STAR

Cement & Mineralsbouc bel air

Component: Piping

Product:

Revamp of a piping system due to excessive wear of the existing installation. Part of the installation was moved from another site to this site, as the installation survived the plant in lifetime. Including scanning & engineering because no drawing existed

View Full Case Study

Have a success story to share?

Join our community of contributors and help others solve similar industrial challenges