Piping

Cement & Mineralsbouc bel air, FR

STAR (+3 pts)
APPROVED

Basic Information

Overview

110 m of ceramic cladded pipes to transport grinded waste (wood, plastic,…) to fire the kiln

Industry

Cement & Minerals

Location

bouc bel air, FR

Component/Workpiece

Piping

Business Type

Integra - Combination

Job Type

New

Type of Wear

Abrasion

Tags

wear-resistant materials
piping revamp
engineering scanning
material selection
installation relocation

Base Metal

Ceramic

General Dimensions (mm)

110 meters

Problem Description

The challenge the customer was facing

Revamp of a piping system due to excessive wear of the existing installation. Part of the installation was moved from another site to this site, as the installation survived the plant in lifetime. Including scanning & engineering because no drawing existed

Previous Service Life

2y

Welding Alloys Solution

How WA solved the challenge

Ceramic cladded pipes manufactured after the entire piping system was 3D scanned.

Product Category

Wear Pipes & Tubes

Product Description

Ceramic cladded pipes

Job Duration

4mo

Technical Advantages

Ceramic offer superior abrasion resistance, especially suited to applications for pneumatic transport of solid waste. Lifetime is improved over 10 times compared to metallic tubes.

Service Life

10y

Images (1)

Photos and visuals for this case study

Case study image 1

Cost Reduction Analysis

Annual Cost Before

€30,000.00

Annual Cost After

€11,500.00

Annual Savings

€18,500.00

61.0% reduction

Annual Cost Comparison
Previous Solution€30,000.00
WA Solution€11,500.00

Cost Breakdown

Part Information
Cost of Part (A):€30,000.00
Cost of WA Solution (B):€115,000.00
Parts Used/Year (E):1
Solution Lifetime Comparison
Previous Solution:1.0 years
WA Solution:10.0 years
WA solution lasts 10.0x longer!
Before (Previous Solution)
Maintenance/Repair (F):-
Disassembly Cost (G):-
Downtime/Event (H):€80,000.00
After (WA Solution)
Maintenance/Repair (F):-
Disassembly Cost (G):-
Downtime/Event (H):€80,000.00
Formula Used

Annual Cost = (A × E) + (E − 1) × (F + G + H)

Where: A = Cost of Part, E = Parts/Year, F = Maintenance, G = Disassembly, H = Downtime

Additional Benefits

Lifetime so long that the parts where still in good shape when the plant was closed down. Our parts were therefore taken to another site, to be reused

Welding Procedure Specification (WPS)

No WPS data available for this case study

Submission Details

Contributor

Sylvestre PERRIN

sylvestre.perrin@wa-produr.com

Created

April 2, 2026

Submitted

April 15, 2026

Approved By

Laslo Ekres

April 15, 2026