Cane Fibrizer Hammers.

SugarChennai, INDIA

STAR (+4 pts)
APPROVED

Basic Information

Overview

The hammers shred the cane before extraction of sucrose in the mill.

Industry

Sugar

Location

Chennai, INDIA

Component/Workpiece

Cane Fibrizer Hammers.

Business Type

Integra - Workshop

Job Type

New

OEM

Fivecalis Kcp

Type of Wear

Abrasion
Impact
Corrosion

Base Metal

Carbon steel SA 516, Gr 70

General Dimensions (mm)

440*150*56 mm

Problem Description

The challenge the customer was facing

Their previous supply to customer is getting worn out in 3 months of operation, they want full campaign solution for the season.

Previous Service Life

3mo

Welding Alloys Solution

How WA solved the challenge

WA Recommended to Go with Hco as base and Tico as hardfacing layer. All side edges to protect with HCTE After discussions with customer and negotiations , we got order for 2 layers of TICo an side edges protection with HCTE.

Product Category

Integra Services

Product Description

Hardface Tico -1.6mm, Hcte -6mm

Job Duration

1mo

Technical Advantages

The customer problem of sand abrasion in cane and heavy impact countered with Tico & HCTE.

Service Life

7mo

Images (5)

Photos and visuals for this case study

Case study image 1Case study image 2Case study image 3Case study image 4Case study image 5

Cost Reduction Analysis

Annual Cost Before

€264.00

Annual Cost After

€26.14

Annual Savings

€237.86

90.0% reduction

Annual Cost Comparison
Previous Solution€264.00
WA Solution€26.14

Cost Breakdown

Part Information
Cost of Part (A):€52.00
Cost of WA Solution (B):€34.00
Parts Used/Year (E):2
Solution Lifetime Comparison
Previous Solution:2.7 months
WA Solution:7.1 months
WA solution lasts 2.6x longer!
Before (Previous Solution)
Maintenance/Repair (F):€25.00
Disassembly Cost (G):€10.00
Downtime/Event (H):€125.00
After (WA Solution)
Maintenance/Repair (F):€25.00
Disassembly Cost (G):€10.00
Downtime/Event (H):€125.00
Formula Used

Annual Cost = (A × E) + (E − 1) × (F + G + H)

Where: A = Cost of Part, E = Parts/Year, F = Maintenance, G = Disassembly, H = Downtime

Additional Benefits

Extended crushing give more productivity and profits to organization.

Welding Procedure Specification (WPS)

3 layer(s) documented

Submission Details

Contributor

Srinivas Atkuri

srinivas.atkuri@welding-alloys.com

Created

April 17, 2026

Submitted

April 17, 2026

Approved By

Laslo Ekres

April 26, 2026